CPD Test Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the cpd test before. Hence you can not start it again.
CPD Test is loading…
You must sign in or sign up to start the cpd test.
You must first complete the following:
Results
Results
0 of 5 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
Unfortunately you didn’t get 100% on this test. You can retake it now.
-
Congratulations, you scored 100%. To download your certificate please click on the below link:
Download Your Certificate
Please add your name and date in yourself by hovering in the space where they should be once you’ve downloaded your certificate. A blue box should appear indicating you can type there.If you have any problems with this, please complete the form here and a member of the team will be in touch.
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
Based on the RIBA stages of works, when is the latest a waterproofing design specialist should be appointed?
-
Question 2 of 5
2. Question
Who can act as a waterproofing design specialist?
-
Question 3 of 5
3. Question
When waterproofing buried roof decks, loose–laid waterproofing systems should only be considered when…
-
Question 4 of 5
4. Question
In the previous version of BS 8102, the primary focus was on the prevention of water ingress from below–ground sources. In the 2022 version, what additional sources of water ingress should be considered?
-
Question 5 of 5
5. Question
The updated BS 8102 suggests all roof decks should be laid to a fall. Ideally the roof slab is cast to a fall, but an unbonded screed could be used to achieve this if required. What fall is recommended?