CPD Test Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the cpd test before. Hence you can not start it again.
CPD Test is loading…
You must sign in or sign up to start the cpd test.
You must first complete the following:
Results
Results
0 of 5 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
Unfortunately you didn’t get 100% on this test. You can retake it now.
-
Congratulations, you scored 100%. To download your certificate please click on the below link:
Download Your Certificate
Please add your name and date in yourself by hovering in the space where they should be once you’ve downloaded your certificate. A blue box should appear indicating you can type there.If you have any problems with this, please complete the form here and a member of the team will be in touch.
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
In a typical rainscreen facade system, the studwork is part of the steel framing system (SFS) that…
-
Question 2 of 5
2. Question
Higher-risk buildings are at least 18m high or have at least…
-
Question 3 of 5
3. Question
What gap are the British Regulations England Part L (BREL) reports hoping to help address?
-
Question 4 of 5
4. Question
Wherever there are small concealed spaces, there must also be…
-
Question 5 of 5
5. Question
The main considerations to achieve a successful insulation specification for your rainscreen facade include…