CPD Test Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the cpd test before. Hence you can not start it again.
CPD Test is loading…
You must sign in or sign up to start the cpd test.
You must first complete the following:
Results
Results
0 of 5 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
In the event of a fire, intumescent material will activate typically at what critical temperature?
-
Question 2 of 5
2. Question
In England, Wales and Northern Ireland, a cavity barrier is required to provide 15 minutes of insulation. What is the requirement in Scotland?
-
Question 3 of 5
3. Question
The use of cavity barriers in rainscreen ventilated facades is designed to prevent what?
-
Question 4 of 5
4. Question
For labyrinth and baffled joints, the air gap must be a minimum of what?
-
Question 5 of 5
5. Question
The conflict between the needs for ventilation and fire sealing can be overcome by the use of what?